Close Menu
    What's Hot

    Miami International Holdings Reports Second Quarter 2026 Results

    August 5, 2026

    Miami International Holdings Reports July 2026 Trading Results

    August 5, 2026

    MONDEVITA ACQUIRES MAJORITY STAKE IN UNDERSCORE DISTRICT, PARENT OF MAGLIANO, IN SECOND STEP OF NEW ITALIAN LUXURY PLATFORM

    August 5, 2026
    Kuwait InquirerKuwait Inquirer
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • More
      • Sports
      • Technology
      • Travel
    Kuwait InquirerKuwait Inquirer
    Home » Abu Dhabi Airports announces reopening of northern runway early
    Travel

    Abu Dhabi Airports announces reopening of northern runway early

    September 28, 2024
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    MENA Newswire News Desk: Abu Dhabi Airports has announced the early reopening of the Northern Runway (13L/31R) at Zayed International Airport, following a successful rehabilitation project. The runway is now fully operational for both arrivals and departures, marking a significant milestone in the airport’s ongoing modernization efforts. The Northern Runway Rehabilitation project involved a range of upgrades aimed at enhancing the runway’s durability and safety.

    Abu Dhabi Airports announces reopening of northern runway early

    Key improvements include the application of 210,000 tonnes of asphalt for reinforcement and resurfacing. In addition, advanced technology was introduced, such as a new ground visibility monitoring system and a state-of-the-art Instrument Landing System (ILS) to increase operational precision. Over 1,200 halogen airfield lights were also replaced with energy-efficient LED technology to reduce the airport’s environmental footprint.

    This transition to LED lighting highlights Abu Dhabi Airports’ commitment to sustainability, aligning with global efforts to reduce energy consumption in the aviation industry. The enhanced navigational aids, including the ILS and the new Runway Visual Range (RVR) system, are expected to improve safety and operational efficiency, particularly during challenging weather conditions.

    Saif Mohammed Al Suwaidi, Director General of the General Civil Aviation Authority (GCAA), praised the project, stating, “The Northern Runway Rehabilitation Project is a testament to Abu Dhabi Airports’ strategic planning and the UAE’s dedication to advancing aviation infrastructure. This development enhances the UAE’s global standing in the aviation sector, aligning with the nation’s vision for long-term growth and prosperity.”

    Elena Sorlini, Managing Director and Chief Executive Officer of Abu Dhabi Airports, added, “Completing the Northern Runway Rehabilitation Project ahead of schedule reflects our commitment to operational excellence. The upgraded infrastructure will allow us to handle increased air traffic and optimize the airport’s capacity, ensuring we continue to meet growing demand.”

    The early reopening of the Northern Runway allows Zayed International Airport to return to dual-runway operations, improving the airport’s ability to manage growing airline traffic. During the rehabilitation period, the airport operated solely on its Southern Runway, successfully managing the increased air traffic without any disruptions to daily operations. Abu Dhabi Airports‘ commitment to enhancing infrastructure through this project further solidifies Zayed International Airport‘s reputation as a leading global aviation hub, offering cutting-edge safety and operational standards.

    Related Posts

    May foreign tourist arrivals drive South Korea travel surplus

    July 27, 2026

    Heat intensifies severe drought across European nations

    July 24, 2026

    Amazon wildfires in Brazil fall to lowest level in four decades

    July 23, 2026

    Private sector wage growth hits six year low in latest UK data

    July 22, 2026

    DR Congo Ebola outbreak reaches 2,267 cases and 893 deaths

    July 18, 2026

    Indonesia begins building $20.9 billion Masela LNG project

    July 18, 2026
    Latest News

    Eastern Washington fires leave 700 structures destroyed

    August 4, 2026

    Michigan reports first deaths tied to cyclospora outbreak

    August 4, 2026

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026
    © 2026 Kuwait Inquirer | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.